The Concrete Pump can be set continuously at any desired output value between 5-30 m³/h and this value can be read digitally.
Highly precise and durable s-tube system can roll very rapidly (1/3 s) and thus ensures uninterrupted injection process.
With the heavy-duty flexible pipe metering pump that is proportional to the concrete pump, each type of setting accelerator additive can be supplied to the system with high accuracy between 2-10% and the amount of additive can be seen in digital.
The 3×70+35 mm² section energy cable rollers for 50m cable, and the direct coupled brush box are designed for maximum security and they are driven by hydraulic motor.
Nozzle Manipulator and the carrier wing may perform what the
human arm and wrist can do and ensure the most suitable injection position in each point of the tunnel section.