The Concrete Pump can be set continuously at any desired output value between 5-30 m³/h and this value can be read digitally.
Highly precise and durable s-tube system can roll very rapidly (1/3 s) and thus ensures uninterrupted injection process.
With the heavy-duty flexible pipe metering pump that is proportional to the concrete pump, each type of setting accelerator additive can be supplied to the system with high accuracy between 2-10% and the amount of additive can be seen in digital.
The 3×70+35 mm² section energy cable rollers for 50m cable, and the direct coupled brush box are designed for maximum security and they are driven by hydraulic motor.
Nozzle Manipulator and the carrier wing may perform what the human arm and wrist can do and ensure the most suitable injection position in each point of the tunnel section.
0-30 m³/h continuous adjustable output capacity
25mm foldable grill
Double Circuit Hydraulic System
24 V Electrical Vibrator
Nozzle Manipulator
Optional Radio Control
Hopper
S-Tube
TECHNICAL DATA
Hydraulic boom and Manipulator and 2 fold+ (2x2m) Telescopic Arm
max. horizontal reach
max vertical reach
m
10
13
Nozzle Manipulator
Power Unit
Pump with axial pistons x2
Tandem Pumps x2
power
voltage
protection
kW
V-Hz
IP
45
400-50
55
Concrete Pump
theoretical capacity
max. concrete pressure
pumping cylinder diameter
hopper volume
m³/h
bar
mm
L
30
65
160x1000
250
Hydraulic Driven Electric Cable Drum
cable length
cable section
m
mm²
50
(3x70)+35
Cable remote control for all robotic hand motions
cable length
m
20
Dosing Pump
type
max. flow
pressure
-
L/min
bar
Hose Pump
10
12
Water and Additive Tanks
capacity
m³
2x1
Water Pump
max. flow
pressure
L/min
bar
60
25
Compressor
max. flow
pressure
engine power
L/min
bar
kW
11
8
55
Hydraulic boom and Manipulator and 2 fold+ (2x2m) Telescopic Arm